EXPERIENCE AND KNOWLEDGE
EXPERIENCE AND
KNOWLEDGE
47 years delivering reliable energy to the main cities in the region.
47 years delivering reliable energy to the main
cities in the region.
PROJECTS IMPLEMENTED
FUEL CONVERSIONS
7 TURBOGENERATORS
CONVERTED
MEGAWATTS
RECOVERED BY
MAINTENANCE
95 TURBINES MAINTAINED
PROJECTS
IMPLEMENTED
FUEL
CONVERSIONS
7 TURBOGENERATORS
CONVERTED
MEGAWATTS
RECOVERED BY
MAINTENANCE
95 TURBINES MAINTAINED
EPC's AND ASSEMBLIES
EPC's AND ASSEMBLIES
“TERMOCARIBE PHASE I”.
DETAIL ENGINEERING OF THERMOELECTRIC
PLANT “TERMOCARIBE”, COLOMBIA.
ELABORATION OF DETAIL ENGINEERING INCLUDING CIVIL, PROCESS, MECHANICAL, ELECTRICAL AND INSTRUMENTATION DISCIPLINES FOR THE FIRST PHASE OF THE THERMOCARIBE GENERATION PLANT (SIMPLE CYCLE 1XSGT800 OPERATION WITH LPG).
CLIENT: TERMO CARIBE S.A.S. E.S.P.
COUNTRY: COLOMBIA
MAKE AND MODEL: SIEMENS SGT-800.
CAPACITY: 1X60 MW.
YEAR: 2021
CIVIL AND INTEGRATION ENGINEERING,
MANAGEMENT, CIVIL WORKS, ELECTROMECHANICAL
ASSEMBLY, MATERIALS SUPPLY AND
COMMISSIONING ASSISTANCE AT THE
“TERMOYOPAL” PLANT.
PLANT ENGINEERING, MANAGEMENT OF CIVIL WORKS PERFORMED BY THIRD PARTIES, SUPPLY OF INTERCONNECTION MATERIALS, ELECTROMECHANICAL INSTALLATION AND ASSISTANCE TO THE COMMISSIONING OF THREE 6000 PF+ UNITS AT TERMOYOPAL GENERACIÓN 2 PLANT.
CLIENT: TERMOYOPAL GENERACIÓN 2 S.A.S. E.S.P.
COUNTRY: COLOMBIA
MAKE AND MODEL: LM 6000 PF+
CAPACITY: 3X50 MW.
YEAR: 2019.
EXECUTION OF IPC FOR THE
“JUAN MANUEL VALDEZ” THERMOELECTRIC PLANT IN GÜIRIA.
ASSEMBLY OF TWO GAS TURBINE GENERATORS, EQUIPMENT ASSOCIATED TO THE BOP AND STEP-UP TRANSFORMER WITH ITS 230KV TRANSMISSION LINE. INCLUDES MECHANICAL MATERIALS SUPPLY AND CIVIL WORKS.
CLIENT: ELECNOR DE VENEZUELA S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS SGT6-5000F.
CAPACITY: 2X180 MW.
YEAR: 2016.
IPC EXECUTION FOR
THERMOELECTRIC
PLANT III, LARA STATE.
ENGINEERING, PROCUREMENT AND CONSTRUCTION FOR THE ASSEMBLY AND START-UP OF TWO OPEN CYCLE LM6000 GENERATION UNITS.
CLIENT: ENELBAR
COUNTRY: VENEZUELA
MAKE AND MODEL: GE LM 6000.
CAPACITY: 2X45 MW.
YEAR: 2012.
IPC EXECUTION FOR THE “ANTONIO JOSE DE SUCRE” THERMOELECTRIC
POWER PLANT , PHASE I.
ASSEMBLY, TESTING AND START-UP OF TWO GE MS7000FA TURBOGENERATORS AND THEIR ASSOCIATED BALANCE OF PLANT EQUIPMENT AT THE THERMOELECTRIC POWER PLANT ANTONIO JOSE DE SUCRE. INCLUDES OPERATION AND MAINTENANCE FOR 1 YEAR.
CLIENT: CONSORCIO ENERGING- TSK
COUNTRY: VENEZUELA
MAKE AND MODEL: GE 7000 FA.
CAPACITY: 2X180 MW.
YEAR: 2012.
IPC EXECUTION FOR THE
“TERMOZULIA III” COMBINED CYCLE.
INSTALLATION AND COMMISSIONING (ASSISTANCE) OF TWO SIEMENS SGT6-5000F GAS TURBINE GENERATORS, INSTALLATION AND TESTING OF THE WATER TREATMENT PLANT, INSTALLATION OF TWO VOGT BOILERS INCLUDING ASME STAMPING AND PRESERVATION.
CLIENT: EIS VENEZUELA S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS SGT-5000 + 2 VOGT HRSG.
CAPACITY: 2X180 MW.
YEAR: 2014.
ELECTROMECHANICAL
ASSEMBLY AT THE “DC SUR”
THERMOELECTRIC POWER PLANT.
ELECTROMECHANICAL INSTALLATION OF TWO GAS TURBINES MODELS FT4 AND LM6000 AT THE EDC SUR PLANT INCLUDING AUXILIARY SERVICES.
CLIENT: ELECNOR DE VENEZUELA S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: PRATT & WHITNEY FT4, GE LM6000.
CAPACITY: 1 X 20 MW, 1 X 48 MW.
YEAR: 2012.
EXECUTION OF CIVIL WORKS
AND ELECTROMECHANICAL ASSEMBLY FOR THE “SAN LORENZO” PLANT.
CIVIL WORKS AND ELECTROMECHANICAL ASSEMBLY OF A 30 MW GAS TURBINE AND ITS AUXILIARY EQUIPMENT. INCLUDES: CIVIL WORKS AND INSTALLATION, CONNECTION AND ASSEMBLY OF DEMINERALIZED WATER PLANT, BOOSTER TRANSFORMER, CONTROL ROOM, VOLTAGE REGULATORS IN ELECTRICAL SUBSTATION AND AERIAL GROUNDING MESH.
CLIENT: PENTECH INGENIEROS 05 C.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS TM2500.
CAPACITY: 30 MW.
YEAR: 2012.
IPC EXECUTION FOR THE
“JUAN BAUTISTA ARISMENDI”
THERMOELECTRIC PLANT .
INSTALLATION, COMMISSIONING STARTUP,AND TESTINGOF TWO GE 7001EA UNITS AT THE JUAN BAUTISTA ARISMENDI PLANT. INCLUDING ELECTRICAL AND GENERAL WORKS AND ASSEMBLY OF SUBSTATIONS.
CLIENT: GTME DE VENEZUELA, S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: GE 7001 EA.
CAPACITY: 2X85 MW.
YEAR: 2014.
IPC EXECUTION FOR “LA RAISA”
THERMOELECTRIC PLANT.
INSTALLATION, COMMISSIONING STARTUP,AND TESTING OF 2 GE 7001 EA UNITS AT LA RAISA PLANT. INCLUDES ASSEMBLY AND TESTING OF THE FUEL GAS SYSTEM (COMPRESSORS).
CLIENT: GTME DE VENEZUELA, S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: GE 7001 EA.
CAPACITY: 2X85 MW.
YEAR: 2010.
ELECTROMECHANICAL ASSEMBLY
FOR THE “EZEQUIEL ZAMORA”
THERMOELECTRIC POWER PLANT.
INSTALLATION OF A SIEMENS W501FD3 GAS TURBINE GENERATOR UNIT AND AUXILIARY EQUIPMENT OF THE GENERATION ISLAND OF THE EZEQUIEL ZAMORA PLANT.
CLIENT: CONSORCIO PACIFIC RIM ENERGY-YUCAL PLACER HTE.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS W501FD3.
CAPACITY: 1X150 MW.
YEAR: 2010.
ELECTROMECHANICAL ASSEMBLY
FOR THE “PICURE” THERMOELECTRIC
POWER PLANT.
INSTALLATION OF 2 GE LM6000 AND 2 GE LM2500 GAS TURBINE GENERATORS. INCLUDING ALL THE ACTIVITIES ASSOCIATED WITH THE INSTALLATION OF THE PICURE POWER PLANT.
CLIENT: PROENERGY SERVICES DE VENEZUELA C.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: GE LM6000, GE LM2500.
CAPACITY: 2X45 MW, 2X20 MW.
YEAR: 2010.
ELECTROMECHANICAL ASSEMBLY OF
GENERATION ISLANDS AT THE
“ALBERTO LOVERA” POWER PLANT.
INSTALLATION OF TWO SIEMENS SGT6-5000 GAS TURBINE GENERATOR UNITS,AND AUXILIARY EQUIPMENT OF THE GENERATION ISLANDS FOR THE ALBERTO LOVERA POWER PLANT.
CLIENT: PACIFIC RIM ENERGY-YUCAL PLACER HTE CONSORTIUM.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS SGT5000.
CAPACITY: 2X145 MW.
YEAR: 2008.
ELECTROMECHANICAL INSTALLATION OF 2 UNITS(SIEMENS W501FD3) AT THE “JOSEFA CAMEJO” THERMOELECTRIC POWER PLANT.
ELECTROMECHANICAL INSTALLATION OF TWO SIEMENS W501FD3 GAS TURBINE GENERATORS UNITS WITH THEIR AUXILIARY EQUIPMENT (BOP) AT THE JOSEFA CAMEJO THERMOELECTRIC PLANT.
CLIENT: PACIFIC RIM ENERGY-YUCAL PLACER HTE CONSORTIUM.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS MODEL W501FD3.
CAPACITY: 2X150 MW.
YEAR: 2007.
“TERMOCARIBE PHASE I”.
DETAIL ENGINEERING OF THERMOELECTRIC
PLANT “TERMOCARIBE”, COLOMBIA.
ELABORATION OF DETAIL ENGINEERING INCLUDING CIVIL, PROCESS, MECHANICAL, ELECTRICAL AND INSTRUMENTATION DISCIPLINES FOR THE FIRST PHASE OF THE THERMOCARIBE GENERATION PLANT (SIMPLE CYCLE 1XSGT800 OPERATION WITH LPG).
CLIENT: TERMO CARIBE S.A.S. E.S.P.
COUNTRY: COLOMBIA
MAKE AND MODEL: SIEMENS SGT-800.
CAPACITY: 1X60 MW.
YEAR: 2021
CIVIL AND INTEGRATION ENGINEERING,
MANAGEMENT, CIVIL WORKS, ELECTROMECHANICAL
ASSEMBLY, MATERIALS SUPPLY AND
COMMISSIONING ASSISTANCE AT THE
“TERMOYOPAL” PLANT.
PLANT ENGINEERING, MANAGEMENT OF CIVIL WORKS PERFORMED BY THIRD PARTIES, SUPPLY OF INTERCONNECTION MATERIALS, ELECTROMECHANICAL INSTALLATION AND ASSISTANCE TO THE COMMISSIONING OF THREE 6000 PF+ UNITS AT TERMOYOPAL GENERACIÓN 2 PLANT.
CLIENT: TERMOYOPAL GENERACIÓN 2 S.A.S. E.S.P.
COUNTRY: COLOMBIA
MAKE AND MODEL: LM 6000 PF+
CAPACITY: 3X50 MW.
YEAR: 2019.
EXECUTION OF IPC FOR THE
“JUAN MANUEL VALDEZ” THERMOELECTRIC
PLANT IN GÜIRIA.
ASSEMBLY OF TWO GAS TURBINE GENERATORS, EQUIPMENT ASSOCIATED TO THE BOP AND STEP-UP TRANSFORMER WITH ITS 230KV TRANSMISSION LINE. INCLUDES MECHANICAL MATERIALS SUPPLY AND CIVIL WORKS.
CLIENT: ELECNOR DE VENEZUELA S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS SGT6-5000F.
CAPACITY: 2X180 MW.
YEAR: 2016.
IPC EXECUTION FOR
THERMOELECTRIC PLANT III, LARA STATE.
ENGINEERING, PROCUREMENT AND CONSTRUCTION FOR THE ASSEMBLY AND START-UP OF TWO OPEN CYCLE LM6000 GENERATION UNITS.
CLIENT: ENELBAR
COUNTRY: VENEZUELA
MAKE AND MODEL: GE LM 6000.
CAPACITY: 2X45 MW.
YEAR: 2012.
EXECUTION OF IPC FOR THE
“JUAN MANUEL VALDEZ” THERMOELECTRIC
PLANT IN GÜIRIA.
ASSEMBLY OF TWO GAS TURBINE GENERATORS, EQUIPMENT ASSOCIATED TO THE BOP AND STEP-UP TRANSFORMER WITH ITS 230KV TRANSMISSION LINE. INCLUDES MECHANICAL MATERIALS SUPPLY AND CIVIL WORKS.
CLIENT: ELECNOR DE VENEZUELA S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS SGT6-5000F.
CAPACITY: 2X180 MW.
YEAR: 2016.
IPC EXECUTION FOR THE
“TERMOZULIA III” COMBINED CYCLE.
INSTALLATION AND COMMISSIONING (ASSISTANCE) OF TWO SIEMENS SGT6-5000F GAS TURBINE GENERATORS, INSTALLATION AND TESTING OF THE WATER TREATMENT PLANT, INSTALLATION OF TWO VOGT BOILERS INCLUDING ASME STAMPING AND PRESERVATION.
CLIENT: EIS VENEZUELA S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS SGT-5000 + 2 VOGT HRSG.
CAPACITY: 2X180 MW.
YEAR: 2014.
ELECTROMECHANICAL
ASSEMBLY AT THE “DC SUR”
THERMOELECTRIC POWER PLANT.
ELECTROMECHANICAL INSTALLATION OF TWO GASTURBINES MODELS FT4 AND LM6000 AT THE EDC SUR PLANT INCLUDING AUXILIARY SERVICES.
CLIENT: ELECNOR DE VENEZUELA S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: PRATT & WHITNEY FT4, GE LM6000.
CAPACITY: 1 X 20 MW, 1 X 48 MW.
YEAR: 2012.
EXECUTION OF CIVIL WORKS
AND ELECTROMECHANICAL ASSEMBLY FOR THE
“SAN LORENZO” PLANT.
CIVIL WORKS AND ELECTROMECHANICAL ASSEMBLY OF A 30 MW GAS TURBINE AND ITS AUXILIARY EQUIPMENT. INCLUDES: CIVIL WORKS AND INSTALLATION, CONNECTION AND ASSEMBLY OF DEMINERALIZED WATER PLANT, BOOSTER TRANSFORMER, CONTROL ROOM, VOLTAGE REGULATORS IN ELECTRICAL SUBSTATION AND AERIAL GROUNDING MESH.
CLIENT: PENTECH INGENIEROS 05 C.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS TM2500.
CAPACITY: 30 MW.
YEAR: 2012.
IPC EXECUTION FOR THE
“JUAN BAUTISTA ARISMENDI”
THERMOELECTRIC PLANT .
INSTALLATION, COMMISSIONING STARTUP,AND TESTINGOF TWO GE 7001EA UNITS AT THE JUAN BAUTISTA ARISMENDI PLANT. INCLUDING ELECTRICAL AND GENERAL WORKS AND ASSEMBLY OF SUBSTATIONS.
CLIENT: GTME DE VENEZUELA, S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: GE 7001 EA.
CAPACITY: 2X85 MW.
YEAR: 2014.
IPC EXECUTION FOR “LA RAISA”
THERMOELECTRIC PLANT.
INSTALLATION, COMMISSIONING STARTUP,AND TESTING OF 2 GE 7001 EA UNITS AT LA RAISA PLANT. INCLUDES ASSEMBLY AND TESTING OF THE FUEL GAS SYSTEM (COMPRESSORS).
CLIENT: GTME DE VENEZUELA, S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: GE 7001 EA.
CAPACITY: 2X85 MW.
YEAR: 2010.
ELECTROMECHANICAL ASSEMBLY
FOR THE “EZEQUIEL ZAMORA”
THERMOELECTRIC POWER PLANT.
INSTALLATION OF A SIEMENS W501FD3 GAS TURBINE GENERATOR UNIT AND AUXILIARY EQUIPMENT OF THE GENERATION ISLAND OF THE EZEQUIEL ZAMORA PLANT.
CLIENT: CONSORCIO PACIFIC RIM ENERGY-YUCAL PLACER HTE.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS W501FD3.
CAPACITY: 1X150 MW.
YEAR: 2010.
ELECTROMECHANICAL ASSEMBLY FOR
THE “PICURE” THERMOELECTRIC
POWER PLANT.
INSTALLATION OF 2 GE LM6000 AND 2 GE LM2500 GAS TURBINE GENERATORS. INCLUDING ALL THE ACTIVITIES ASSOCIATED WITH THE INSTALLATION OF THE PICURE POWER PLANT.
CLIENT: PROENERGY SERVICES DE VENEZUELA C.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: GE LM6000, GE LM2500.
CAPACITY: 2X45 MW, 2X20 MW.
YEAR: 2010.
ELECTROMECHANICAL ASSEMBLY OF
GENERATION ISLANDS AT THE
“ALBERTO LOVERA” POWER PLANT.
INSTALLATION OF TWO SIEMENS SGT6-5000 GAS TURBINE GENERATOR UNITS,AND AUXILIARY EQUIPMENT OF THE GENERATION ISLANDS FOR THE ALBERTO LOVERA POWER PLANT.
CLIENT: PACIFIC RIM ENERGY-YUCAL PLACER HTE CONSORTIUM.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS SGT5000.
CAPACITY: 2X145 MW.
YEAR: 2008.
ELECTROMECHANICAL INSTALLATION OF 2 UNITS
(SIEMENS W501FD3) AT THE “JOSEFA CAMEJO”
THERMOELECTRIC POWER PLANT.
ELECTROMECHANICAL INSTALLATION OF TWO SIEMENS W501FD3 GAS TURBINE GENERATORS UNITS WITH THEIR AUXILIARY EQUIPMENT (BOP) AT THE JOSEFA CAMEJO THERMOELECTRIC PLANT.
CLIENT: PACIFIC RIM ENERGY-YUCAL PLACER HTE CONSORTIUM.
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS MODEL W501FD3.
CAPACITY: 2X150 MW.
YEAR: 2007.
MAINTENANCE
MAJOR OVERHAUL OF
TURBOGENERATOR CAGUA
NR. 5- GE UNIT MS5001 P.
MAJOR OVERHAUL OF AGE MS5001 P GAS TURBINE GENERATOR UNIT, AT TURBOVEN'S CAGUA GENERATION PLANT. INCLUDES CIVIL WORKS AND INTERNAL REPAIRS.
CLIENT: TURBOVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001P.
CAPACITY: 1X25 MW.
YEAR: 2022.
MAJOR MAINTENANCE OF
TURBOGENERATOR MARACAY
NR. 2 - GE UNIT MS5001 P.
MAJOR OVERHAUL OF A GE MS5001 P GAS TURBINE GENERATOR UNIT, AT TURBOVEN'S MARACAY GENERATION PLANT. INCLUDES CIVIL WORKS OF ADEQUACY AND INTERNAL REPAIRS.
CLIENT: TURBOVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001 P.
CAPACITY: 1X25 MW.
YEAR: 2021.
MAJOR OVERHAUL OF
TURBOGENERATOR CAGUA
NR. 4 - GE UNIT MS5001 P.
MAJOR OVERHAUL OF A GE MS5001 P GAS TURBINE GENERATOR UNIT, NUMBER CG04 AT TURBOVEN'S CAGUA GENERATION PLANT. INCLUDES CIVIL WORKS AND INTERNAL REPAIRS.
CLIENT: TURBOVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001 P.
CAPACITY: 1X25 MW.
YEAR: 2021.
REPLACEMENT AND COMMISSIONING OF THE “MARK V” TO “MARK VIe” TURBINE CONTROL SYSTEM FOR TWO TGM 6FA TURBINES.
CONTROL SYSTEMS UPGRADE, ELECTRICAL AND SIGNAL INSTALLATIONS, ENGINEERING, SUPPLY OF PARTS AND MINOR REPAIRS OF 2 MS6001FA GAS TURBINE GENERATORS AT TERMOGAS MACHALA PLANT, ECUADOR.
CLIENT: CELEC EP -TERMOGAS MACHALA
COUNTRY: ECUADOR
MAKE AND MODEL: GE 6FA.
CAPACITY: 1X77 MW.
YEAR: 2020
SPECIALIZED CONSULTING SERVICES
AND TECHNICAL FIELD SUPPORT FOR
SIEMENS IN “EL ENCINO”, MEXICO.
PROFESSIONAL SERVICES FOR SUPERVISION, INSTALLATION, COMMISSIONING, MANAGEMENT AND COORDINATION ON SITE. SUPPLY OF TOOLS AND EQUIPMENT FOR THE EXECUTION OF THE SERVICE IN EL ENCINO, MEXICO.
CLIENT: SIEMENS ENERGY INC.
COUNTRY: MEXICO
MAKE AND MODEL: SIEMENS SGT-800.
CAPACITY: 2X60 MW.
YEAR: 2019.
SPECIALIZED CONSULTING
SERVICES AND TECHNICAL
SUPPORT IN THE FIELD.
PROFESSIONAL SERVICES FOR SUPERVISION, INSTALLATION, COMMISSIONING, MANAGEMENT AND ON-SITE COORDINATION. TOOLS SUPPLY AND EQUIPMENT FOR THE SERVICE EXECUTION IN GRAN CHACO AND RIO GRANDE, BOLIVIA.
CLIENT: SIEMENS ENERGY INC
COUNTRY: BOLIVIA
MAKE AND MODEL: SIEMENS SGT-600, SGT-800.
CAPACITY: 3X25 MW, 2X60 MW.
YEAR: 2018.
TECHNICAL SUPPORT IN THE
FIELD FOR SIEMENS IN RIO
GRANDE, BOLIVIA.
PROFESSIONAL SERVICES FOR SUPERVISION, INSTALLATION COMMISSIONING, SITE MANAGEMENT AND COORDINATION. TOOLS AND EQUIPMENT SUPPLY FOR THE SERVICE EXECUTION IN GRAN CHACO AND RIO GRANDE, BOLIVIA.
CLIENT: SIEMENS ENERGY INC
COUNTRY: BOLIVIA
MAKE AND MODEL: SIEMENS SGT-400.
CAPACITY: 2X13 MW.
YEAR: 2018.
LOGISTICS SERVICES FOR
EMERGENCY RECOVERY OF AG3 UNIT
FOR LEVEL B MAINTENANCE
(ARGIMIRO GABALDÓN PLANT).
SUPPLY OF CRANE AND RIGGING EQUIPMENT, SPECIALIZED TOOLS, MATERIALS, QUALIFIED WELDING, TESTS AND INSPECTIONS FOR LEVEL B MAINTENANCE OF THE AG3 UNIT.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS SGT-800.
CAPACITY: 40 MW.
YEAR: 2016
MAJOR OVERHAUL OF THE TG-6 UNIT
(HITACHI MS5001 P) FOR THE “ANA
MARIA CAMPOS” PETROCHEMICAL
COMPLEX POWER PLANT.
MAJOR OVERHAUL OF A HITACHI MS5001 GAS TURBINE GENERATOR UNIT. INCLUDING SPECIALIZED LABOR, SUPPLY OF CAPITAL PARTS, MATERIALS, EQUIPMENT AND TOOLS FOR THE ELECTRICAL PLANT OF THE ANA MARIA CAMPOS PETROCHEMICAL COMPLEX (EL TABLAZO).
CLIENT: PEQUIVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: HITACHI-MS5001P.
CAPACITY: 21 MW.
YEAR: 2016.
RECOVERY AND COMMISSIONING OF
UNIT NO. 2 (SIEMENS W501F4) OF
THE “DON LUIS ZAMBRANO” PLANT.
REPLACEMENT OF A SIEMENS W501F4 TURBO COMPRESSOR UNIT AT THE DON LUIS ZAMBRANO PLANT. MAINTENANCE OF AUXILIARY EQUIPMENT.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS W501F4.
CAPACITY: 170 MW.
YEAR: 2016.
REHABILITATION, COMMISSIONING
AND START-UP OF TURBOGENERATOR
UNIT (SIEMENS W501FD3) AT
THERMOELECTRIC PLANT
“TERMOCARABOBO II”.
INSPECTION, MAINTENANCE, COMMISSIONING AND START-UP OF A SIEMENS W501FD3 UNIT , INCLUDING START-UP AND COMMISSIONING OF CAMERON WG-64 COMPRESSORS.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS W501FD3.
CAPACITY: 150 MW.
YEAR: 2016.
REHABILITATION OF UNITS IN TZ,
RU, PGP AND SL PLANTS
FOR ZULIA STATE.
MAJOR OVERHAUL AND SUPPLY OF SPARE PARTS FOR THE REHABILITATION OF GE & HITACHI GAS TURBINE GENERATOR UNITS (DIFFERENT MODELS) IN TERMOZULIA, RAFAEL URDANETA, PUNTA-GORDA AND SAN LORENZO POWER PLANTS LOCATED IN ZULIA STATE.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001, HITACHI MS5001, GE MS7001FA.
CAPACITY: 2 X 20 MW, 2 X 20 MW, 1 X 150 MW.
YEAR: 2015.
TYPE B MAINTENANCE FOR UNIT
TZ05 AT “TERMOZULIA COMPLEX”.
LOGISTIC SERVICES FOR HOT GAS PATH INSPECTION OF A SIEMENS W5001FD3 AT TERMOZULIA COMPLEX.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS W501FD3.
CAPACITY: 150 MW.
YEAR: 2015
LOGISTICS SERVICES FOR MAJOR
OVERHAUL OF UNIT NO. 1”JOSEFA
CAMEJO” PLANT.
SUPPLY OF SKILLED LABOR, CRANE AND RIGGING EQUIPMENT , AND SPECIALIZED TOOLS FOR THE MAJOR OVERHAUL OF A SIEMENS W501FD3 GAS TURBINE GENERATOR AT THE JOSEFA CAMEJO PLANT.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS W501FD3.
CAPACITY: 150 MW.
YEAR: 2015.
MAJOR OVERHAUL OF UNITS RU05
AND RU06 OF THE “GENERAL RAFAEL
URDANETA” THERMOELECTRIC COMPLEX.
INSPECTION, MAJOR OVERHAUL AND COMMISSIONING OF TWO GE MS5001 GAS TURBINE GENERATOR AT THE GENERAL RAFAEL URDANETA THERMOELECTRIC COMPLEX.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001.
CAPACITY: 2X20 MW.
YEAR: 2012.
EXECUTION AND TECHNICAL
INTERVENTION FOR THE GENERATOR
ROTOR REPLACEMENT OF THE CG-04
UNIT OF THE “CASIGUA” PLANT.
REPLACEMENT OF THE GENERATOR ROTOR , INCLUDING SPECIALIZED TECHNICAL PERSONNEL, QUALIFIED LABOR, EQUIPMENT AND TOOLS.
CLIENT: ENELVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: HITACHI-5001.
CAPACITY: 1X20 MW.
YEAR: 2010.
REPAIR AND MAJOR MAINTENANCE TO
TURBINE NR. 1 OF “CARORA” PLANT.
TECHNICAL INSPECTION, REPAIR AND MAJOR OVERHAUL OF GE MS5001 GAS TURBINE GENERATOR AT CARORA PLANT.
CLIENT: ENELBAR
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001.
CAPACITY: 1X20 MW.
YEAR: 2006.
MAJOR OVERHAUL OF UNIT NO. 6
(G.E. FRAME 7 TURBINE OF 60MW)
LOCATED AT “GUANTA” PLANT.
MAINTENANCE OF UNIT NO. 6 (GE - 7E TURBINE) INCLUDING SPECIALIZED TECHNICAL PERSONNEL, QUALIFIED LABOR, EQUIPMENT AND TOOLS.
CLIENT: CADAFE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MODEL 7E.
CAPACITY: 90 MW.
YEAR: 2003.
MAJOR MAINTENANCE OF TURBINES
NR. 2, 3 AND 5 FOR PLANT II.
MAJOR MAINTENANCE OF THE GENERATOR STATORS OF TURBINES 2, 3 AND 5 INCLUDING CAPITAL PARTS SUPPLY, INSPECTION AND SPECIALIZED TECHNICAL PERSONNEL.
CLIENT: ENELBAR
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001P.
CAPACITY: 3X20 MW.
YEAR: 2002.
MAJOR MAINTENANCE AT UNIT 21SB
IN SANTA BÁRBARA DEL ZULIA.
HOT PARTS INSPECTION AND MAINTENANCE OF GENERATOR ROTOR/STATOR AT UNIT 21SB IN SANTA BÁRBARA DEL ZULIA.
CLIENT: ENELVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001 P.
CAPACITY: 1X20 MW.
YEAR: 2002.
MAINTENANCE, CAPITAL PARTS
SUPPLY AND COMMISSIONING FOR 7
TURBOGENERATORS AT PUNTO FIJO
POWER PLANT.
MAINTENANCE OF 7 GAS TURBINES MS5001 AT PUNTO FIJO POWER PLANT. INCLUDES WORKSHOP WORKS, TECHNICAL INSPECTIONS, SPARE PARTS SUPPLY AND COMMISSIONING.
CLIENT: CADAFE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001 P.
CAPACITY: 7X25 MW.
YEAR: 2001.
MAJOR OVERHAUL OF
TURBOGENERATOR CAGUA
NR. 5- GE UNIT MS5001 P.
MAJOR OVERHAUL OF AGE MS5001 P GAS TURBINE GENERATOR UNIT, AT TURBOVEN'S CAGUA GENERATION PLANT. INCLUDES CIVIL WORKS AND INTERNAL REPAIRS.
CLIENT: TURBOVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001P.
CAPACITY: 1X25 MW.
YEAR: 2022.
MAJOR MAINTENANCE OF
TURBOGENERATOR MARACAY
NR. 2 - GE UNIT MS5001 P.
MAJOR OVERHAUL OF A GE MS5001 P GAS TURBINE GENERATOR UNIT, AT TURBOVEN'S MARACAY GENERATION PLANT. INCLUDES CIVIL WORKS OF ADEQUACY AND INTERNAL REPAIRS.
CLIENT: TURBOVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001 P.
CAPACITY: 1X25 MW.
YEAR: 2021.
MAJOR OVERHAUL OF
TURBOGENERATOR CAGUA
NR. 4 - GE UNIT MS5001 P.
MAJOR OVERHAUL OF A GE MS5001 P GAS TURBINE GENERATOR UNIT, NUMBER CG04 AT TURBOVEN'S CAGUA GENERATION PLANT. INCLUDES CIVIL WORKS AND INTERNAL REPAIRS.
CLIENT: TURBOVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001 P.
CAPACITY: 1X25 MW.
YEAR: 2021.
REPLACEMENT AND COMMISSIONING
OF THE “MARK V” TO “MARK VIe”
TURBINE CONTROL SYSTEM
FOR TWO TGM 6FA TURBINES.
CONTROL SYSTEMS UPGRADE, ELECTRICAL AND SIGNAL INSTALLATIONS, ENGINEERING, SUPPLY OF PARTS AND MINOR REPAIRS OF 2 MS6001FA GAS TURBINE GENERATORS AT TERMOGAS MACHALA PLANT, ECUADOR.
CLIENT: CELEC EP -TERMOGAS MACHALA
COUNTRY: ECUADOR
MAKE AND MODEL: GE 6FA.
CAPACITY: 1X77 MW.
YEAR: 2020
SPECIALIZED CONSULTING SERVICES
AND TECHNICAL FIELD SUPPORT
FOR SIEMENS IN “EL ENCINO”, MEXICO.
PROFESSIONAL SERVICES FOR SUPERVISION, INSTALLATION, COMMISSIONING, MANAGEMENT AND COORDINATION ON SITE. SUPPLY OF TOOLS AND EQUIPMENT FOR THE EXECUTION OF THE SERVICE IN EL ENCINO, MEXICO.
CLIENT: SIEMENS ENERGY INC.
COUNTRY: MEXICO
MAKE AND MODEL: SIEMENS SGT-800.
CAPACITY: 2X60 MW.
YEAR: 2019.
SPECIALIZED CONSULTING SERVICES AND TECHNICAL SUPPORT IN THE FIELD.
PROFESSIONAL SERVICES FOR SUPERVISION, INSTALLATION, COMMISSIONING, MANAGEMENT AND ON-SITE COORDINATION. TOOLS SUPPLY AND EQUIPMENT FOR THE SERVICE EXECUTION IN GRAN CHACO AND RIO GRANDE, BOLIVIA.
CLIENT: SIEMENS ENERGY INC
COUNTRY: BOLIVIA
MAKE AND MODEL: SIEMENS SGT-600, SGT-800.
CAPACITY: 3X25 MW, 2X60 MW.
YEAR: 2018.
TECHNICAL SUPPORT IN THE FIELD
FOR SIEMENS IN RIO
GRANDE, BOLIVIA.
PROFESSIONAL SERVICES FOR SUPERVISION, INSTALLATION COMMISSIONING, SITE MANAGEMENT AND COORDINATION. TOOLS AND EQUIPMENT SUPPLY FOR THE SERVICE EXECUTION IN GRAN CHACO AND RIO GRANDE, BOLIVIA.
CLIENT: SIEMENS ENERGY INC
COUNTRY: BOLIVIA
MAKE AND MODEL: SIEMENS SGT-400.
CAPACITY: 2X13 MW.
YEAR: 2018.
LOGISTICS SERVICES FOR
EMERGENCY RECOVERY OF AG3 UNIT
FOR LEVEL B MAINTENANCE (ARGIMIRO GABALDÓN PLANT).
SUPPLY OF CRANE AND RIGGING EQUIPMENT, SPECIALIZED TOOLS, MATERIALS, QUALIFIED WELDING, TESTS AND INSPECTIONS FOR LEVEL B MAINTENANCE OF THE AG3 UNIT.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS SGT-800.
CAPACITY: 40 MW.
YEAR: 2016
MAJOR OVERHAUL OF THE TG-6 UNIT
(HITACHI MS5001 P) FOR THE “ANA
MARIA CAMPOS” PETROCHEMICAL COMPLEX POWER PLANT.
MAJOR OVERHAUL OF A HITACHI MS5001 GAS TURBINE GENERATOR UNIT. INCLUDING SPECIALIZED LABOR, SUPPLY OF CAPITAL PARTS, MATERIALS, EQUIPMENT AND TOOLS FOR THE ELECTRICAL PLANT OF THE ANA MARIA CAMPOS PETROCHEMICAL COMPLEX (EL TABLAZO).
CLIENT: PEQUIVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: HITACHI-MS5001P.
CAPACITY: 21 MW.
YEAR: 2016.
RECOVERY AND COMMISSIONING OF
UNIT NO. 2 (SIEMENS W501F4) OF
THE “DON LUIS ZAMBRANO” PLANT.
REPLACEMENT OF A SIEMENS W501F4 TURBO COMPRESSOR UNIT AT THE DON LUIS ZAMBRANO PLANT. MAINTENANCE OF AUXILIARY EQUIPMENT.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS W501F4.
CAPACITY: 170 MW.
YEAR: 2016.
REHABILITATION, COMMISSIONING
AND START-UP OF TURBOGENERATOR
UNIT (SIEMENS W501FD3) AT
THERMOELECTRIC PLANT
“TERMOCARABOBO II”.
INSPECTION, MAINTENANCE, COMMISSIONING AND START-UP OF A SIEMENS W501FD3 UNIT , INCLUIDING START-UP AND COMMISSIONING OF CAMERON WG-64 COMPRESSORS.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS W501FD3.
CAPACITY: 150 MW.
YEAR: 2016.
REHABILITATION OF UNITS IN TZ, RU, PGP AND SL PLANTS FOR ZULIA STATE.
MAJOR OVERHAUL AND SUPPLY OF SPARE PARTS FOR THE REHABILITATION OF GE & HITACHI GAS TURBINE GENERATOR UNITS (DIFFERENT MODELS) IN TERMOZULIA, RAFAEL URDANETA, PUNTA-GORDA AND SAN LORENZO POWER PLANTS LOCATED IN ZULIA STATE.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001, HITACHI MS5001, GE MS7001FA.
CAPACITY: 2 X 20 MW, 2 X 20 MW, 1 X 150 MW.
YEAR: 2015.
TYPE B MAINTENANCE FOR UNIT
TZ05 AT “TERMOZULIA COMPLEX”.
LOGISTIC SERVICES FOR HOT GAS PATH INSPECTION OF A SIEMENS W5001FD3 AT TERMOZULIA COMPLEX.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS W501FD3.
CAPACITY: 150 MW.
YEAR: 2015
LOGISTICS SERVICES FOR MAJOR
OVERHAUL OF UNIT NO. 1”JOSEFA
CAMEJO” PLANT.
SUPPLY OF SKILLED LABOR, CRANE AND RIGGING EQUIPMENT , AND SPECIALIZED TOOLS FOR THE MAJOR OVERHAUL OF A SIEMENS W501FD3 GAS TURBINE GENERATOR AT THE JOSEFA CAMEJO PLANT.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: SIEMENS W501FD3.
CAPACITY: 150 MW.
YEAR: 2015.
MAJOR OVERHAUL OF UNITS RU05
AND RU06 OF THE “GENERAL RAFAEL
URDANETA” THERMOELECTRIC COMPLEX.
INSPECTION, MAJOR OVERHAUL AND COMMISSIONING OF TWO GE MS5001 GAS TURBINE GENERATOR AT THE GENERAL RAFAEL URDANETA THERMOELECTRIC COMPLEX.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001.
CAPACITY: 2X20 MW.
YEAR: 2012.
EXECUTION AND TECHNICAL
INTERVENTION FOR THE GENERATOR
ROTOR REPLACEMENT OF THE CG-04
UNIT OF THE “CASIGUA” PLANT.
REPLACEMENT OF THE GENERATOR ROTOR , INCLUDING SPECIALIZED TECHNICAL PERSONNEL, QUALIFIED LABOR, EQUIPMENT AND TOOLS.
CLIENT: ENELVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: HITACHI-5001.
CAPACITY: 1X20 MW.
YEAR: 2010.
REPAIR AND MAJOR MAINTENANCE TO
TURBINE NR. 1 OF “CARORA” PLANT.
TECHNICAL INSPECTION, REPAIR AND MAJOR OVERHAUL OF GE MS5001 GAS TURBINE GENERATOR AT CARORA PLANT.
CLIENT: ENELBAR
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001.
CAPACITY: 1X20 MW.
YEAR: 2006.
MAJOR OVERHAUL OF UNIT NO. 6
(G.E. FRAME 7 TURBINE OF 60MW)
LOCATED AT “GUANTA” PLANT.
MAINTENANCE OF UNIT NO. 6 (GE - 7E TURBINE) INCLUDING SPECIALIZED TECHNICAL PERSONNEL, QUALIFIED LABOR, EQUIPMENT AND TOOLS.
CLIENT: CADAFE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MODEL 7E.
CAPACITY: 90 MW.
YEAR: 2003.
MAJOR MAINTENANCE OF TURBINES
NR. 2, 3 AND 5 FOR PLANT II.
MAJOR MAINTENANCE OF THE GENERATOR STATORS OF TURBINES 2, 3 AND 5 INCLUDING CAPITAL PARTS SUPPLY, INSPECTION AND SPECIALIZED TECHNICAL PERSONNEL.
CLIENT: ENELBAR
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001P.
CAPACITY: 3X20 MW.
YEAR: 2002.
MAJOR MAINTENANCE AT UNIT 21SB
IN SANTA BÁRBARA DEL ZULIA.
HOT PARTS INSPECTION AND MAINTENANCE OF GENERATOR ROTOR/STATOR AT UNIT 21SB IN SANTA BÁRBARA DEL ZULIA.
CLIENT: ENELVEN
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001 P.
CAPACITY: 1X20 MW.
YEAR: 2002.
MAINTENANCE, CAPITAL PARTS
SUPPLY AND COMMISSIONING FOR 7
TURBOGENERATORS AT PUNTO FIJO POWER PLANT.
MAINTENANCE OF 7 GAS TURBINES MS5001 AT PUNTO FIJO POWER PLANT. INCLUDES WORKSHOP WORKS, TECHNICAL INSPECTIONS, SPARE PARTS SUPPLY AND COMMISSIONING.
CLIENT: CADAFE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001 P.
CAPACITY: 7X25 MW.
YEAR: 2001.
GAS CONVERSIONS
GAS CONVERSIONS
FUEL CONVERSION TO GAS
OF 2 MS7001EA GAS TURBINE GENERATOR AT
THE “JUAN BAUTISTA ARISMENDI ”PLANT.
EXECUTION OF CIVIL WORKS, ADAPTATION OF AUXILIARY SYSTEMS AND MACHINE WORKS FOR THE CONVERSION TO GAS OF 2 GE FRAME 7EA GAS TURBINE GENERATORS AT THE JUAN BAUTISTA ARISMENDI PLANT.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE FRAME 7EA.
CAPACITY: 2X 85 MW.
YEAR: 2016.
CONVERSION TO GAS OF
TURBOGENERATORS OF THE
“TERMOZULIA IV” PLANT.
FUEL CONVERSION TO GAS OF 2 GE FRAME 7EA GAS TURBINE GENERATORS AT THE THERMOZULIA IV COMBINED CYCLE PLANT. INCLUDING MECHANICAL CONFIGURATION AND ADAPTATION OF THE CONTROL SYSTEM FOR OPERATION WITH THE NEW FUEL.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE FRAME 7EA.
CAPACITY: 2X 85 MW.
YEAR: 2016.
FUEL CONVERSION TO GAS FOR 5 GE FRAME
5 AND A MS6001B GAS TURBINE GENERATORS AT
THE “LUISA CÁCERES DE ARISMENDI” PLANT.
EXECUTION OF CIVIL WORKS, ADAPTATION OF AUXILIARY SYSTEMS, INTERNAL MACHINE WORK FOR GAS CONVERSION OF THE 5 GE MS5001 AND 6B.03 UNITS AT THE LCA PLANT.
CLIENT: GTME DE VENEZUELA, S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001, GE 6B.03.
CAPACITY: 2X 30 MW, 3X 45 MW.
YEAR: 2015.
CONVERSION TO GAS OF 2 TURBOGENERATORS
OF THE “JOSEFA JOAQUINA
SÁNCHEZ BASTIDAS” PLANT (TACOA).
FUEL CONVERSION TO GAS OF 2 GE FRAME 7EA TURBOGENERATORS OF THE JOSEFA JOAQUINA SÁNCHEZ BASTIDAS PLANT (TACOA).INCLUDING MECHANICAL CONFIGURATION AND ADAPTATION OF THE CONTROL SYSTEM FOR OPERATION WITH THE NEW FUEL.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE FRAME MODEL 7FA.
CAPACITY: 2X180 MW.
YEAR: 2015.
CONVERSION TO GAS FOR 2 7001EA
TURBOGENERATORS LOCATED AT THE
"JUAN BAUTISTA ARISMENDI" PLANT.
FUEL CONVERSION TO GAS OF 2 GE FRAME 7EA GAS TURBINE GENERATORS AT THE JUAN BAUTISTA ARISMENDI PLANT. INCLUDING MECHANICAL CONFIGURATION AND ADAPTATION OF THE CONTROL SYSTEM FOR OPERATION WITH THE NEW FUEL.
CLIENT: GTME DE VENEZUELA.S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MODEL 7001EA.
CAPACITY: 2X85 MW.
YEAR: 2015.
FUEL CONVERSION TO GAS
OF 2 MS7001EA GAS TURBINE GENERATOR AT
THE “JUAN BAUTISTA” ARISMENDI PLANT.
EXECUTION OF CIVIL WORKS, ADAPTATION OF AUXILIARY SYSTEMS AND MACHINE WORKS FOR THE CONVERSION TO GAS OF 2 GE FRAME 7EA GAS TURBINE GENERATORSATTHE JUAN BAUTISTA ARISMENDI PLANT.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE FRAME 7EA.
CAPACITY: 2X85 MW.
YEAR: 2016.
CONVERSION TO GAS OF
TURBOGENERATORS OF THE
“TERMOZULIA IV” PLANT.
FUEL CONVERSION TO GAS OF 2 GE FRAME 7EA GAS TURBINE GENERATORS AT THE THERMOZULIA IV COMBINED CYCLE PLANT. INCLUIDING MECHANICAL CONFIGURATION AND ADAPTATION OF THE CONTROL SYSTEM FOR OPERATION WITH THE NEW FUEL.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE FRAME 7EA.
CAPACITY: 2X85 MW.
YEAR: 2016.
FUEL CONVERSION TO GAS FOR 5 GE FRAME
5 AND A MS6001B GAS TURBINE GENERATORS AT
THE “LUISA CÁCERES” DE ARISMENDI PLANT.
EXECUTION OF CIVIL WORKS, ADAPTATION OF AUXILIARY SYSTEMS, INTERNAL MACHINE WORK FOR GAS CONVERSION OF THE 5 GE MS5001 AND 6B.03 UNITS AT THE LCA PLANT.
CLIENT: GTME DE VENEZUELA, S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: GE MS5001, GE 6B.03.
CAPACITY: 2X30MW, 3X45MW.
YEAR: 2015.
CONVERSION TO GAS OF 2 TURBOGENERATORS
OF THE “JOSEFA JOAQUINA
SÁNCHEZ BASTIDAS” PLANT (TACOA).
FUEL CONVERSION TO GAS OF 2 GE FRAME 7EA TURBOGENERATORS OF THE JOSEFA JOAQUINA SÁNCHEZ BASTIDAS PLANT (TACOA).INCLUDING MECHANICAL CONFIGURATION AND ADAPTATION OF THE CONTROL SYSTEM FOR OPERATION WITH THE NEW FUEL.
CLIENT: PRIVATE
COUNTRY: VENEZUELA
MAKE AND MODEL: GE FRAME MODEL 7FA.
CAPACITY: 2X180 MW.
YEAR: 2015.
CONVERSION TO GAS FOR 2 7001EA
TURBOGENERATORS LOCATED AT THE
JUAN BAUTISTA ARISMENDI PLANT.
FUEL CONVERSION TO GAS OF 2 GE FRAME 7EA GAS TURBINE GENERATORS AT THE JUAN BAUTISTA ARISMENDI PLANT. INCLUDING MECHANICAL CONFIGURATION AND ADAPTATION OF THE CONTROL SYSTEM FOR OPERATION WITH THE NEW FUEL.
CLIENT: GTME DE VENEZUELA.S.A.
COUNTRY: VENEZUELA
MAKE AND MODEL: GE
MODEL 7001EA.
CAPACITY: 2X85 MW.
YEAR: 2015.
Do not hesitate to contact us and leave us your contact information to know in detail your requirements: